ABSTRACT
The 200W solar system was determined by load assessment, solar panel number determination, battery requirement and then inverter sizing. A complete solar panel rated at 200w was however purchased, together with 2 no. 150A solar battery, 1500W inverter and also 10A charge controller. These were assembled together with necessary protective gadgets like cut out switches; to give the 200W expected. The solar panel was mounted outside the building to allow for maximum collection of sun energy. It is expected that the system will help the department meet up with its office duties even when central power is not available.
CHAPTER ONE
INTRODUCTION
1.1 NEED FOR THE PROJECT
The general objective of the system is to provide efficiency, steadiness in the use of power appliances, by ensuring continuous availability of power supply even in the absence of mains. Uninterruptability of the system made it possible to eliminate all suspense from mains outage during the execution of an important and urgent assignment as may be required.
For better production of the system, the system was operated at a fully charged condition of the battery.
The project was rated 200W of 220V and 50Hz. It was expected that at this condition, it was favourable to carry load of the stipulated power. Loads of low power factors are not helpful since they produce spikes. Overloading is not potent to provide zero change over time and the inverter had LEDs which indicates mains failure and battery discharge and system fault.
1.2 SCOPE OF STUDY
This solar power source makes it possible to provide a clean reliable supply of alternative electricity free of sags or surges which could be found in the line voltage frequency......
================================================================
Item Type: Project Material | Size: 41 pages | Chapters: 1-5
Format: MS Word | Delivery: Within 30Mins.
================================================================